Earlier this year, Cornerstone received a phone call from a facility manager from local SAU 95, which is the Windham School District in Windham, New Hampshire. He expressed his interest in having someone come take a look at some interior projects they would need to have completed while school was out for summer break, and an appointment was scheduled with the facility manager for the following week.

After meeting with the facility manager to review the size and scope of the project, Cornerstone provided the SAU with an estimate for their interior painting. Several months later we were awarded the project at Windham Middle School and preparation for this project began almost immediately.

This particular project includes several areas within the school. Common areas like hallways, stairwells, boys and girl's bathrooms and locker rooms, the cafeteria and stage area, as well as a staff bathroom. Walls, along with door drames, spindles, risers, elevator doors, and handrails are a few of the items that would be painted. Due to its size and time constraints, this project involves a larger crew and will be completed over several weeks, and was started immediately.

Products used for this product are from the Benjamin Moore Ultra Spec Low VOC line. You can find more information on these products here: http://www.benjaminmoore.com/en-us/for-contractors/product-catalog?prod=Ultra_Spec_500_Interior_Paint#piSheen=538&tab=3

Pictures from this project to be uploaded upon completion.